Old School Doug
Unwilling participant in the idiocracy.
After morning commitments and an unplanned replacement of 2 garage door pull cables I managed to get in some work.
AZT....over spray of metallic silver is finished. I'll probably do the gloss coat on Monday.
King Kraken.......wet sanded the exterior of the tube fins, masked the interior and got the final color coat done.
Don't Drink and Paint.....sanded the 1st primer coat. Found some grain on 2 of the fins so I gave them a light coat of thinned CWF. Sanded them down and shot the 2nd primer coat.
Tomorrow the Crawler (or bug or something) will get a wet sand of the 2nd primer coat and I'll shoot the base coat.
Depending on how well the Kraken tubes dry, I might start mounting them to the airframe.
Looks like I might just reach the goal of having them all ready for next Saturday. Fingers crossed.
AZT....over spray of metallic silver is finished. I'll probably do the gloss coat on Monday.
King Kraken.......wet sanded the exterior of the tube fins, masked the interior and got the final color coat done.
Don't Drink and Paint.....sanded the 1st primer coat. Found some grain on 2 of the fins so I gave them a light coat of thinned CWF. Sanded them down and shot the 2nd primer coat.
Tomorrow the Crawler (or bug or something) will get a wet sand of the 2nd primer coat and I'll shoot the base coat.
Depending on how well the Kraken tubes dry, I might start mounting them to the airframe.
Looks like I might just reach the goal of having them all ready for next Saturday. Fingers crossed.