- Joined
- Jun 4, 2018
- Messages
- 1,296
- Reaction score
- 941
OOP for CAD is OpenSCAD.
Nice thread so far.
I'm becoming familiar with filling pin holes! Although it's more critical for me since my goal was to use a colored sleeve and avoid the weight of paint except on the nose and fins.
My Soller sleeved project is a 4 inch, so no shrink sleeve.....and pin holes have become the bane of this project.
Shrink wrap from Soller but its not really a final layer, but rather to assist with the sock. Not sure if they have any "final layer" heat shrink or not.
Can you pleas send me the 3D print file or company you got the switch mounts from?Have been working on the electronics bay, doing so I revised how I had it wired.
View attachment 440329
Electronics bay holding the RCC3
View attachment 440330
And the other side that will have the Raven as well as the pull-pin wiring setup.
View attachment 440331
38" and 54" or 38mm and 54mm? Is this going into outer space?
The way this is drawn, closing the power switch doesn’t connect the two RRC3 switch terminals to each other. You really only need an SPST between the two.I drew up the wiring diagram for the eventual full electronics bay, learning Kicad (at least some of it) as I was doing so.
View attachment 438457
But here is what I'm going to concentrate on for the first flight... main at apogee, motor backup, plumbed for drogue but will probably go with the Jolly Logic but we'll see.
View attachment 438456
Enter your email address to join: