snrkl
Well-Known Member
- Joined
- Apr 11, 2017
- Messages
- 1,368
- Reaction score
- 210
The race is on to get rustoleum base and highlight colour on plastic (QT) in one week.
Today: primer
I have an appt in 20mins. As soon as that’s done, primer will be sanded,
Wiped and rustoleum matte black is going down.
The rustoleum usually need 7days to dry on plastic before it’s ok to put a different colour down.
With rustoleum, the rule is “all on in 60mins, or wait 24hrs” and if plastic “wait 5-6 days...”
We’ve got warm dry weather, so I’m hoping some trips in the sun hanging on the washing line might help... [emoji6]
Today: primer
I have an appt in 20mins. As soon as that’s done, primer will be sanded,
Wiped and rustoleum matte black is going down.
The rustoleum usually need 7days to dry on plastic before it’s ok to put a different colour down.
With rustoleum, the rule is “all on in 60mins, or wait 24hrs” and if plastic “wait 5-6 days...”
We’ve got warm dry weather, so I’m hoping some trips in the sun hanging on the washing line might help... [emoji6]