conman13
Well-Known Member
- Joined
- Sep 18, 2013
- Messages
- 2,703
- Reaction score
- 77
Sorry for the lack of an updates thread but I have 6 more days to have everything don and packed. Everything is primed minus sustainer.
Need to do:
- 3 shear pin holes in sustainer
- nose cone AVbay
- prime/paint/decals on everything
Ordered some more wire to complete the setup of the electronics bays.
I am really cutting it close. Hopefully I can finish all the drilling and nose one AVbay tomorrow so I just have to paint.
Sent from my iPod touch using Rocketry Forum
Need to do:
- 3 shear pin holes in sustainer
- nose cone AVbay
- prime/paint/decals on everything
Ordered some more wire to complete the setup of the electronics bays.
I am really cutting it close. Hopefully I can finish all the drilling and nose one AVbay tomorrow so I just have to paint.
Sent from my iPod touch using Rocketry Forum