RocketTree
Well-Known Member
Looking for help building altimeter bay and attempt dual deployment on the 4" G-Force. Already have the altimeters and parts to build 'coupler and switch band' or 'slide-in' bays.
Now I see there is not enough room to use a coupler and switch band, since that is all taken up by parachutes and shock cord. (see photo)
Will the bay have to be installed into the upper body tube instead, or should I add a payload bay extension to it?
Have all the parts here, but not sure where/how it should be mounted in the rocket. How is it fastened with access to power switch etc..
(edited my post to be more specific)
I also have to do these for 2.6" mirage and 1.9 Arreaux if possible
Now I see there is not enough room to use a coupler and switch band, since that is all taken up by parachutes and shock cord. (see photo)
Will the bay have to be installed into the upper body tube instead, or should I add a payload bay extension to it?
Have all the parts here, but not sure where/how it should be mounted in the rocket. How is it fastened with access to power switch etc..
(edited my post to be more specific)
I also have to do these for 2.6" mirage and 1.9 Arreaux if possible
Attachments
Last edited: