I know I'm not doing anything ground-breaking here... just wanted feedback on my idea for my little 4" dink.
I'm not the biggest fan of the glove tip method. I don't know why, I just always worry about getting them packed tight enough, etc. I'd rather just run charge wells on my next build... but I also don't want to mess with BP at a field. SO, I did my own variation of the charge wells from LOC and came up with this. (radius is for the 4" dink AV bay). The idea is I print several of the "charge modules" and those get prepped and packed before the launch. Go to the launch, screw the modules into the base which is epoxied to the AV bay, hook the wires up, and send it. After recovery, unscrew the old, screw in the new, rinse and repeat.
Thoughts?
I'm not the biggest fan of the glove tip method. I don't know why, I just always worry about getting them packed tight enough, etc. I'd rather just run charge wells on my next build... but I also don't want to mess with BP at a field. SO, I did my own variation of the charge wells from LOC and came up with this. (radius is for the 4" dink AV bay). The idea is I print several of the "charge modules" and those get prepped and packed before the launch. Go to the launch, screw the modules into the base which is epoxied to the AV bay, hook the wires up, and send it. After recovery, unscrew the old, screw in the new, rinse and repeat.
Thoughts?