Rocketeer Gator
Well-Known Member
- Joined
- Aug 12, 2010
- Messages
- 806
- Reaction score
- 3
This is my 8" "BlueTube" bay for my 3" rocket.I have a dual deploy/data Entacore altimeter on order that I'm going to use.Has anyone have any experience with these or suggestions? I have 3 1/8" holes drilled in it ,is that enough,or too much?My payload section is 3" X 18" so 2g's of BP should do the trick.:confused2: Plan on doing a ground test first anyways but looking for advice since this is my first HPR rocket.Also are epoxy fillets enough on the sled or something more? First launch will be with H128 but plan on stepping up to LVL 2 with same rocket with a J350.