I now have a Vander-Burn upgrade set on-hand, but in the first DBRM I built, using the stock cardboard rings, I extended the motor mount with a section of BMS T52H (using a short length of BT55 coupler on the outside to join the tube sections) and added a forth ring forward, a spare BMS 3" to 52H I happened to have on hand.Question for all of you, has anyone, ordered a longer 29 mm MMT? for their upgrade. If so what size and did you change the spacing on the rings or added a fourth one?
Will likely do that for the others too. Whether I want to fly a long motor or not, it keeps the laundry forward and requires less nose weight (none - according to sims - in the one I built so far, using a chute release and heavier-than-stock shock cord and chute).