- Joined
- May 29, 2019
- Messages
- 1,234
- Reaction score
- 993
I'm building an 8" Composite Warehouse Prometheus.
The question I have is how do you guys that build these large ones square the tubing coupler in the back/bottom of the nose cone?
I can get it close (probably more than close enough) by eye/hand, but I'd really like to know if there's a good way to align an ogive cone with a cylinder....errr inserted into its backside.
The question I have is how do you guys that build these large ones square the tubing coupler in the back/bottom of the nose cone?
I can get it close (probably more than close enough) by eye/hand, but I'd really like to know if there's a good way to align an ogive cone with a cylinder....errr inserted into its backside.