n3tjm
Papa Elf
Started my LOC Warlock tonight.
First I designed and printed a Fin Guide to help align the fins on the motor tube.
Removed the Glassine layer from the motor tube
Dry fitted the retainer and aft centering ring on the motor tube. Marked the motor tube where the Aft ring will go.
First Glue applied. Blind nuts in place, seated with CA. Shock Cord Anchored and its hardware sealed with epoxy, Forward centering ring Glued in place with Gorilla wood Glue. Tomorrow will sand the fins and continue the build.
First I designed and printed a Fin Guide to help align the fins on the motor tube.
Removed the Glassine layer from the motor tube
Dry fitted the retainer and aft centering ring on the motor tube. Marked the motor tube where the Aft ring will go.
First Glue applied. Blind nuts in place, seated with CA. Shock Cord Anchored and its hardware sealed with epoxy, Forward centering ring Glued in place with Gorilla wood Glue. Tomorrow will sand the fins and continue the build.
Last edited: