Loc has a redesigned ebay which works on this and the 7.5 Phoenix where you can build the bay with one end recessed in for more chute space. I plan to build one in the next month or so.I am looking to drag the largest box off of my build pile, finally. I am wondering if it is possible to do HED with the RNWS in place? Otherwise, is there a better or different option for dual deploy on this airframe?
Doughnut e-bay.I am looking to drag the largest box off of my build pile, finally. I am wondering if it is possible to do HED with the RNWS in place? Otherwise, is there a better or different option for dual deploy on this airframe?
Enter your email address to join: