o1d_dude
'I battle gravity'
Not trying to start a wet sanding vs dry sanding primer discussion here. Just trying to track down something I read once that discussed whether we should tin the ends of our wiring at the altimeter or terminal strips ends. In both cases we use compression/mechanical means to make the connections need for dual-deploy.
I seem to recall a compelling argument was made that we should NOT tin the ends of the wires as "loose" wiring allows a better connection because the wire can compress to maximize surface area in the contact.
Can anyone weigh in on this? I'm wiring up a few alts and was wondering...
I seem to recall a compelling argument was made that we should NOT tin the ends of the wires as "loose" wiring allows a better connection because the wire can compress to maximize surface area in the contact.
Can anyone weigh in on this? I'm wiring up a few alts and was wondering...