n3tjm
Papa Elf
This is a project that was originally scheduled to be done last summer, but it got delayed when the IT cabinet arrived weeks late and damaged in shipping. I didn't have time to do it before school started so I made plans to do it while school was closed over the holiday break. Here is a before and after pictures.