Got the booster, payloads, and switchband cut from 3" tube for my L2 cert rocket. Cut the fins and centering rings a few days ago. Once I get the booster tube slotted, it will be in "kit form" equivalent and I can start assembly. Still pondering on the electronics bay(s), and whether or not I can spring for a motor retainer.
Also watched the farm boys get up most of the cotton across the road. Then after dark, they got up about half the small field beside me. The mice, rats and snakes get displaced when the fields are worked. The cats will contain the vermin, but I wish they'd done it in the daytime so I could keep an eye out for snakes.
And that's rocket related, because when they're done, I have somewhere to give this rocket a maiden flight before committing it to a J-motor!
Also watched the farm boys get up most of the cotton across the road. Then after dark, they got up about half the small field beside me. The mice, rats and snakes get displaced when the fields are worked. The cats will contain the vermin, but I wish they'd done it in the daytime so I could keep an eye out for snakes.
And that's rocket related, because when they're done, I have somewhere to give this rocket a maiden flight before committing it to a J-motor!