Tail gunner Rob:
https://www.thedrive.com/the-war-zone/10237/the-u-s-air-forces-last-tail-gunner-has-retired
Resurrected B-52H Ghost Rider Reenters Active Service
https://www.thedrive.com/the-war-zo...st-rider-reenters-active-service-at-minot-afb
"This was the first time a B-52H has been pulled out of storage and returned to the fleet. 12 other examples remain in type 1000 storage at Davis Monthan AFB, and it looks like the same units and commands that helped resurrected Ghost Rider will be doing it all over again, following the recent loss of a B-52H during takeoff from Andersen AFB, in Guam."
It took a whopping 45,000 man-hours to get the jet fully operational, and the aircraft needed an additional 7,000 hours of work compared with a normal B-52Hs depot-level maintenance. This was due to the fact that the jet had been sitting stagnant for so long, and that Ghost Rider's systems needed to be upgraded so they would be on par with other B-52Hs in the fleet. Tinkers portion of the $13M project was spread over 272 days.
https://www.thedrive.com/the-war-zone/10237/the-u-s-air-forces-last-tail-gunner-has-retired
Resurrected B-52H Ghost Rider Reenters Active Service
https://www.thedrive.com/the-war-zo...st-rider-reenters-active-service-at-minot-afb
"This was the first time a B-52H has been pulled out of storage and returned to the fleet. 12 other examples remain in type 1000 storage at Davis Monthan AFB, and it looks like the same units and commands that helped resurrected Ghost Rider will be doing it all over again, following the recent loss of a B-52H during takeoff from Andersen AFB, in Guam."
It took a whopping 45,000 man-hours to get the jet fully operational, and the aircraft needed an additional 7,000 hours of work compared with a normal B-52Hs depot-level maintenance. This was due to the fact that the jet had been sitting stagnant for so long, and that Ghost Rider's systems needed to be upgraded so they would be on par with other B-52Hs in the fleet. Tinkers portion of the $13M project was spread over 272 days.