n1lul
Well-Known Member
- Joined
- Oct 12, 2009
- Messages
- 102
- Reaction score
- 0
I am rigging the electronics section of my new 3" Honest John.
I have drawn up the schematics for having the deployment charges shorted until on the pad a ready to fire.
Is it worth the extra wiring, switches, ect. to have the charges shorted until ready to launch? I have never had a problem with premature firing but I know it is safer.
Thanks
I have drawn up the schematics for having the deployment charges shorted until on the pad a ready to fire.
Is it worth the extra wiring, switches, ect. to have the charges shorted until ready to launch? I have never had a problem with premature firing but I know it is safer.
Thanks