I *know* I remember reading on this forum about 3 years ago that the BATFE issued a newsletter saying inventory measurements of black powder should be rounded up to the nearest whole pound. Does someone recall which newsletter? Since I typically use 15 grams at a time, my inventory sheet looks like
-15 g for rocket launch 1 lb remaining
-15 g for rocket launch 1 lb remaining
-15 g for rocket launch 1 lb remaining
-15 g for rocket launch 1 lb remaining
-15 g for rocket launch 1 lb remaining
Today I had an inspector who said he had not heard of that rule, and he said it didn't make sense that the records should show an unchanging amount...that I should be posting the actual remaining amount. What he says makes sense to me; 15 g is about 0.5 oz. But I'm almost sure that contradicts what I read in a post here on the Forum about a past newsletter. The orange book doesn't specify, meaning Federal Statue is silent on this, but some faceless administrator QC'ing the agent's work can still refuse to process the request if it doesn't comply with the technical bulletins. I've tried Googling, Googling:rocketryforum.com, and searching the BATF newsletters, but nothing.
Does someone here remember the post? (Please don't let this devolve into ad-hominem attacks on the inspector, or the idiocy of the law. It is what it is.)
-15 g for rocket launch 1 lb remaining
-15 g for rocket launch 1 lb remaining
-15 g for rocket launch 1 lb remaining
-15 g for rocket launch 1 lb remaining
-15 g for rocket launch 1 lb remaining
Today I had an inspector who said he had not heard of that rule, and he said it didn't make sense that the records should show an unchanging amount...that I should be posting the actual remaining amount. What he says makes sense to me; 15 g is about 0.5 oz. But I'm almost sure that contradicts what I read in a post here on the Forum about a past newsletter. The orange book doesn't specify, meaning Federal Statue is silent on this, but some faceless administrator QC'ing the agent's work can still refuse to process the request if it doesn't comply with the technical bulletins. I've tried Googling, Googling:rocketryforum.com, and searching the BATF newsletters, but nothing.
Does someone here remember the post? (Please don't let this devolve into ad-hominem attacks on the inspector, or the idiocy of the law. It is what it is.)