ActingLikeAKid
Well-Known Member
- Joined
- Nov 16, 2015
- Messages
- 1,134
- Reaction score
- 16
This is mostly a placeholder because I won't be able to start construction for .... probably a month or so. But this is going to be cool. 54mm mount, fiberglass fins, LOC tubes. I'm thinking I'll glass it (because why not!!). Once I tear it open and see what I have, I'm going to seriously consider buying a LOC e-bay and making this dual-deploy. After my horrible first experience with Aerotech DMS, even if I don't make it dual-deploy, I may try an altimeter-fired charge as a backup for the motor, just because:
1 - good experience for growing into dual-deploy
2 - I'm not a fan of scraping up bits of rocket from the ground.

1 - good experience for growing into dual-deploy
2 - I'm not a fan of scraping up bits of rocket from the ground.
