Ray Dunakin
Well-Known Member
- Joined
- Jan 9, 2003
- Messages
- 1,021
- Reaction score
- 0
I've just finished posting a set of detailed construction photos for a 2.6" camera payload using an electronic timer:
https://albums.photo.epson.com/j/AlbumIndex?u=3009006&a=31278774
My previous payloads have all used a mechanical servo-and-lever mechanism to activate the camera, which is pretty easy to set up and doesn't require hacking into the camera. But that's too bulky to fit into a 2.6" tube, so I've always used a boxy payload capsule. The timer allows a more streamline tubular payload (a bit heavier than the foam core box though).
I had several goals when I designed this payload:
1. It had to be quick and easy to access the camera.
2. The timer had to be accessible too.
3. It had to descend in an upright position, like my other payloads.
4. The mirror shroud had to be removable, for easy repair or replacement.
It took me a while to come up with a design that accomplishes these goals, and I'm pleased with the results. I even converted the normally wasted space in the coupler into a bay for a recording altimeter (non-deployment).
The camera and timer can be easily accessed simply by removing four small screws and sliding the full-length coupler tube from the payload airframe.
Any questions or comments, feel free to ask!
https://albums.photo.epson.com/j/AlbumIndex?u=3009006&a=31278774
My previous payloads have all used a mechanical servo-and-lever mechanism to activate the camera, which is pretty easy to set up and doesn't require hacking into the camera. But that's too bulky to fit into a 2.6" tube, so I've always used a boxy payload capsule. The timer allows a more streamline tubular payload (a bit heavier than the foam core box though).
I had several goals when I designed this payload:
1. It had to be quick and easy to access the camera.
2. The timer had to be accessible too.
3. It had to descend in an upright position, like my other payloads.
4. The mirror shroud had to be removable, for easy repair or replacement.
It took me a while to come up with a design that accomplishes these goals, and I'm pleased with the results. I even converted the normally wasted space in the coupler into a bay for a recording altimeter (non-deployment).
The camera and timer can be easily accessed simply by removing four small screws and sliding the full-length coupler tube from the payload airframe.
Any questions or comments, feel free to ask!