JHydrazine
Member
- Joined
- Jan 19, 2009
- Messages
- 6
- Reaction score
- 0
Hello Everyone,
I just completed a build of a 4" BSD Little John set up for dual deploy.
I am employing an RRC2 altimeter with Newton's 3rd ejection canisters using 0.5gm of ffff powder for the drogue event and 1gm for the main (starting points subject to change with testing results).
I am looking for methods used for ground testing the setup as this is my first attempt at dual deployment. I seem to recall past threads/video of testing methods (rocket horizontal with a vacuum source at the ebay vent hole).
Questions:
1) I have drilled 3 ebay vent holes and if the vacuum method is used, do I need to seal 2 holes and use the last for the test?
2) After removing the vacuum source, I assume the drogue charge will be set off immediatly ( simulating apogee) and then the main ( the alt is set for 500ft)
Is this what I should expect?
Any input is greatly appreciated.
Thank you
I just completed a build of a 4" BSD Little John set up for dual deploy.
I am employing an RRC2 altimeter with Newton's 3rd ejection canisters using 0.5gm of ffff powder for the drogue event and 1gm for the main (starting points subject to change with testing results).
I am looking for methods used for ground testing the setup as this is my first attempt at dual deployment. I seem to recall past threads/video of testing methods (rocket horizontal with a vacuum source at the ebay vent hole).
Questions:
1) I have drilled 3 ebay vent holes and if the vacuum method is used, do I need to seal 2 holes and use the last for the test?
2) After removing the vacuum source, I assume the drogue charge will be set off immediatly ( simulating apogee) and then the main ( the alt is set for 500ft)
Is this what I should expect?
Any input is greatly appreciated.
Thank you