cyberwollf
Active Member
- Joined
- Nov 1, 2015
- Messages
- 28
- Reaction score
- 0
Started putting together a pad from some parts of a trampoline that got destroyed in a hurricane a while back. Each leg is 36 inches.
Haven't decided how to build out the attachment point for rail and rods yet.
So long as the rocket hangs towards the center of the pad, should I have to worry about tipping? Maybe a sandbag on the middle leg?
Haven't decided how to build out the attachment point for rail and rods yet.
So long as the rocket hangs towards the center of the pad, should I have to worry about tipping? Maybe a sandbag on the middle leg?
