What are some methods you guys use to block the MMT when doing ground testing for deployment charges?
In previous builds, I’ve used old SU 38mm motors that I’ve epoxied the charge well closed to simulate what it would be like in flight. My newest project has a 75mm mmt that I’m adapting down to 54 but I don’t have any old SU motors that I could use. Would duct taping over the forward end of the mmt be fine?
In previous builds, I’ve used old SU 38mm motors that I’ve epoxied the charge well closed to simulate what it would be like in flight. My newest project has a 75mm mmt that I’m adapting down to 54 but I don’t have any old SU motors that I could use. Would duct taping over the forward end of the mmt be fine?
Last edited: