I'm working on constructing my first electronics bay, 2" in diameter containing an RRC2 altimeter and Perfectflite MiniTimer. The rocket is also 54mm in diameter and is flying on a G staged to a G. The first flights will help me to gain experience using the dual deploy altimeter on just the sustainer before adding the booster and the timer.
I have three questions:
1) Where is the best place to get a supply of black powder for ejection charges?
2) If using the twist and tuck method, do the wires stick out of the altimeter vent hole or do I cut their own hole and do I have to seal that with tape before launch?
3) What is the best method for ground testing the entire system?
Thanks in advance.
I have three questions:
1) Where is the best place to get a supply of black powder for ejection charges?
2) If using the twist and tuck method, do the wires stick out of the altimeter vent hole or do I cut their own hole and do I have to seal that with tape before launch?
3) What is the best method for ground testing the entire system?
Thanks in advance.