vicmeister
Member
- Joined
- May 19, 2015
- Messages
- 8
- Reaction score
- 0
Hi, I am in the process of building a Giant Leap Firestorm 54 - fiberglass with dual deployment. I have the version with the lower stage one piece, 36 inches long. I need to epoxy (JB Weld) a hardpoint (for hock cord etc) 13 inches from the fore end. What is the best way to place the epoxy inside the 2 inch tube? I am thinking of a long brush or other tool but am wondering if any better ideas. Thanks