Overeasy123
Well-Known Member
- Joined
- Dec 30, 2010
- Messages
- 144
- Reaction score
- 8
Do I post this in WDYDRWT?
No. I'm gonna keep a Running Log of these builds, right here.
They've been slow-goin', sure, but in the last 18 hours the Interior Tubes and all 54 Fins have been Sanding-Sealer'd and sprayed with 2X White Primer!
The Fins & Tubes are assuredly-cured in 2X Real Orange, so final assemblage is looming.
YIPPEE!
No. I'm gonna keep a Running Log of these builds, right here.
They've been slow-goin', sure, but in the last 18 hours the Interior Tubes and all 54 Fins have been Sanding-Sealer'd and sprayed with 2X White Primer!
The Fins & Tubes are assuredly-cured in 2X Real Orange, so final assemblage is looming.
YIPPEE!
Last edited: