Cory
Well-Known Member
I’ve used HEDD (head end dual deploy) successfully a few time in a 3” Punisher and have seen many more in various sizes. Usually the main is placed inside the NC and the apogee event separates the NC+Switchband with the avionics from the payload section and the main event blows the NC off the av-bay. My question is has anyone tried putting a drogue in the NC with the main in the payload? It is a tight fit to get a main in a 3” NC for heavier birds, but there is adequate room for a decent drogue. So if I have plenty of room on the payload side why not use it for the main?
I would probably use an extra shear pin on the payload side as the drogue would be pulling directly on them. That pulling by the drougue opening the main early seems the only potential downfall of swapping, but I would like to get some input- especially from any who may have tried this already.
I would probably use an extra shear pin on the payload side as the drogue would be pulling directly on them. That pulling by the drougue opening the main early seems the only potential downfall of swapping, but I would like to get some input- especially from any who may have tried this already.