gizza2
Well-Known Member
- Joined
- Jan 31, 2009
- Messages
- 93
- Reaction score
- 1
Does anyone know if there's a minimum, optimum, or maximum delay between oven curing an Aeropoxy structure and post-curing?
I'm really short on time these days and would prefer to build the part at night, cure it for 90 mins, leave it overnight, and post-cure the next day. Are there any mechanical or thermal tradeoffs with such a time gap?
Thanks in advance.
I'm really short on time these days and would prefer to build the part at night, cure it for 90 mins, leave it overnight, and post-cure the next day. Are there any mechanical or thermal tradeoffs with such a time gap?
Thanks in advance.