[The] sled for the payload to hold: MW RRC3, MW T3 tracker, micro peak altimeter, 2 lipo batteries with twist and tape.
First 2 flights will be black powder direct stage with tumble recovery on the booster, and a rrc2+ in the payload with a apogee charge, and cable cutter holding the main... Then the G80T-10 》 G40W will have drag separation, the booster motor eject with separate the motor from booster, a recovery harness and small chute will tie the 2 together. The RRC3 will ignite the G40w on the auxiliary channel, and the apogee charge and cable cutter will be setup the same as before.