Kehoes23
Well-Known Member
- Joined
- Jan 8, 2013
- Messages
- 966
- Reaction score
- 49
So, for now I put the RamJet away for now and will get back to it when I finish this build.
I started with the upper payload bay by fiberglassing it with one wrap of 8.5oz.
I got all the parts for the motor mount and started that next. Here are a few pics of what I did so far.
Got the holes drilled for the motor retainer
Got the retainer on with motor case
All the parts for the MM, for got to include the U bolts
Marking spots to drill
Taped the CR together and start drilling the holes
Time to dry fit everything, is this overkill for the recovery system?
Next I'll be glassing the main body tube, all four feet of it:tongue:
I started with the upper payload bay by fiberglassing it with one wrap of 8.5oz.
I got all the parts for the motor mount and started that next. Here are a few pics of what I did so far.
Got the holes drilled for the motor retainer
Got the retainer on with motor case
All the parts for the MM, for got to include the U bolts
Marking spots to drill
Taped the CR together and start drilling the holes
Time to dry fit everything, is this overkill for the recovery system?
Next I'll be glassing the main body tube, all four feet of it:tongue: