Chuck
Well-Known Member
- Joined
- Oct 16, 2012
- Messages
- 174
- Reaction score
- 1
After lurking around for the past few months I feel that my building skills have improved enough to warrent a worthwhile build thread. So, after sorting through all of my kits I decided to start the Estes V2.
Here is the layout of all the parts. I ditched the stock parachute and shock cord. I replaced them with braided kevlar and a 24" ripstop nylon parachute.
This is the MMT test fitted together.
This picture has the fins test fitted into the boat tail.
Next step is to start glueing everything together!
Here is the layout of all the parts. I ditched the stock parachute and shock cord. I replaced them with braided kevlar and a 24" ripstop nylon parachute.
This is the MMT test fitted together.
This picture has the fins test fitted into the boat tail.
Next step is to start glueing everything together!