-
30th May 2012, 02:31 AM
#22
Here is the final step to the build of the breadbox/shotgun tube. Please note that I have not yet attached the chute and I plan on using a parachute swivel even though I was told that it was not needed. Pictures are in order. The final step that needs to be dealt with is the installation of the Shock Cord Hardpoint Anchor. Although I do not plan on using it. I will be posting some pictures showing how it is glued in place.
1. Glued Piston and Charge Cap to Kevlar shock cord.
2. Completeded breadbox/shotgun tube assembly.

Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules