I am building a Performance Rocketry Intimidator 4 as my first dual deploy rocket. Everything has gone great so far, but I have become stuck towards the end here.
The Kit does not come with an centering ring that would keep the Alt bay from sliding down the airframe durring launch. My plan was to drill holes in the alt bay to the upper payload section and secure the alt bay with some nuts and bolts. Stupid Idea?
Any help would be great!
Thanks!
The Kit does not come with an centering ring that would keep the Alt bay from sliding down the airframe durring launch. My plan was to drill holes in the alt bay to the upper payload section and secure the alt bay with some nuts and bolts. Stupid Idea?
Any help would be great!
Thanks!