Charles_McG
Ciderwright
I'm pondering rigging my current build (300% NASA Pegasus Estes 1376) to descend with the tube near horizontal to change the landing load on those big swept back fins.
I have some ideas for sheltering an external line during boost - but am still working on how to attach an aft line to the main chute line and (especially) get it under the tubing at the break point without weakening the tube.
My searches of the forum haven't yielded anything, so I'm asking for ideas.
I have some ideas for sheltering an external line during boost - but am still working on how to attach an aft line to the main chute line and (especially) get it under the tubing at the break point without weakening the tube.
My searches of the forum haven't yielded anything, so I'm asking for ideas.