- Joined
- Aug 27, 2011
- Messages
- 2,818
- Reaction score
- 25
OK...sorry progress has been slow up here...had to work around the house and I am moving my son back to college tomorrow so that was basically a day packing up the minivan...lol...but I finally got the thrust structure painted and attached. You want to line up the bottom of the BT 50 tube with the BT-5 motor mount tube...you want these to be flush with one another.
I tried to line up the edge of a roll band to be right between the fuel tanks. That is where you will want your fins to attach and the fins will have to be painted to match the roll band pattern. I had to come back and touch up the roll bands on the thrust structure so that they would line up between the fins..I will post better pictures when I hang the fins. Hopefully the attached pictures do a better job at describing this...lol. Mine are pretty close to being on target...then again..it took me three times to line it up...
I tried to line up the edge of a roll band to be right between the fuel tanks. That is where you will want your fins to attach and the fins will have to be painted to match the roll band pattern. I had to come back and touch up the roll bands on the thrust structure so that they would line up between the fins..I will post better pictures when I hang the fins. Hopefully the attached pictures do a better job at describing this...lol. Mine are pretty close to being on target...then again..it took me three times to line it up...