Pyropetepete
Well-Known Member
- Joined
- Jan 27, 2014
- Messages
- 902
- Reaction score
- 9
Not sure if I need to do this or not so best to ask. It's for my dual deploy build, so main and drouge sections. She's a 54mm bird
Airframe sections are made up from 2 of these....
4'' dia
20'' long
These are joined by the AV bay which is an 8'' long coupler, so 4'' is in each airframe, this making a total of 16''.
The Nose cone shoulder is 2.5'' for the main and the drouge will also have a coupler for the join to the booster which will also be 4''.
Main Airframe = 13.5''
Drouge Airframe = 12''
Hope this all makes some sense
Do I need to drill any pressure relief hole's? If so what size and where about along the length
Thanks
Airframe sections are made up from 2 of these....
4'' dia
20'' long
These are joined by the AV bay which is an 8'' long coupler, so 4'' is in each airframe, this making a total of 16''.
The Nose cone shoulder is 2.5'' for the main and the drouge will also have a coupler for the join to the booster which will also be 4''.
Main Airframe = 13.5''
Drouge Airframe = 12''
Hope this all makes some sense
Do I need to drill any pressure relief hole's? If so what size and where about along the length
Thanks
Last edited: